欧美日韩国产欧,91精选情侣酒店偷拍电影,自拍偷拍第一,成人免费一级,五月天天丁香婷婷在线中,欧美精品黄,日韩成人精品视频在线观看

APP下載
機會在手,求職信息實時掌握
    Alternate Text
    APP下載
    Alternate Text
    微信公眾號
    Alternate Text
    小程序
當前位置:首頁> 列表 >職位詳情
供應鏈分析師
面議 杭州 應屆畢業(yè)生 本科
  • 全勤獎
  • 節(jié)日福利
  • 不加班
  • 周末雙休
博世電動工具(中國)有限公司 2025-06-21 22:07:42 469人關注
職位描述
該職位還未進行加V認證,請仔細了解后再進行投遞!
In order to implement PT Reporting Standards, collect and analyze Supply Chain Costs (key-driver, KPI-Tree) and provide transparency for improvement activities of Bosch Power Tools, we are looking for a Capability Expert. Scope: ?Regional SCC (Supply Chain Cost) Controller and coordination in Region AP, as well as key contributor to PT global SCC topics as defined; within MBR/CF and TBP timeframes capacity is dedicated to the below mentioned topics. Authority ?Coordinate SCC topics and activities (TBP/CF planning cycles, reporting etc.) in the region ?Derive and lead regional CIP-activities or Taskforces (in alignment with PT LOG central) ?Single contact to/from GS for PT SCC topics (SCC Planning, Reporting, Taskforce, CIP-activities) ?Single contact for PT/BUs for SCC topics (requests, query etc.) ?Support PT BUs, Plants, Region/CSO, BOPs and GS teams together to achieve the PT SCC targets Main Responsibilities ?General ?Identify gaps in process and teach entities/colleagues e.g., with support from CPE, CTG, LOC ?Push Ratio at LOG inputs in each entity, avoid double counting etc., and share best practice and saving potentials within region ?Provide project calculations for SCC related topics for SCND decision making ?Check allocation base each year and update them in the system to have latest current business structure reflected after alignment with PT central(LOC, CTG, CPE) ?Support and implement new standards for reporting e.g., IFS, IFRS based on PT/CTG guidance for SCC related topics (MBR) also in terms of costs for new IT systems e.g., S4/HANA (G/L accounts). Ensure region coordination and execution according to PT central (LOC, CTG, CPE) ?TBP/CF Cycles ?Preparation in general (Templates, meetings, timeline, technical setup check for upload in SAP on cost center level) according to aligned PT global standards ?Execution/Adaption for AP specific (alignment with entities, adjusted timelines fit to global timing, ensure data consistency and quality) ?Align C/C(cost center) planning in SAP as future base for CF02.2x ?Verify the C/C structure yearly to ensure the fitting to reporting needs ?Ensure consistency between GS cost report for CF and PT CF reporting in HFM (explain differences if deviating): 1st run mostly check for error correction, consistency, SAP->BICOP->HFM validation; 2nd run check in HFM for follow-up of errors, alignments etc. ?MBR Cycles ?Check of cost center G/L accounts bookings on right elements (fix/var etc.) including key allocation for the responsible region ?Monthly review meetings with Region/CSO xDC W/H for the SCC development, and support to the plant/LOG for SCC topics (consistency of planning with Ratio at LOG, performance tracking for affected WH and plants as part of ww SCC performance tracking with PEO, R
聯(lián)系方式
注:聯(lián)系我時,請說是在四川人才網(wǎng)上看到的。
工作地點
地址:杭州濱江區(qū)杭州濱康路567號博世電動工具(中國)有限公司(北門)
求職提示:用人單位發(fā)布虛假招聘信息,或以任何名義向求職者收取財物(如體檢費、置裝費、押金、服裝費、培訓費、身份證、畢業(yè)證等),均涉嫌違法,請求職者務必提高警惕。
top
投遞簡歷
馬上投遞
更多優(yōu)質崗位等你來挑選   加入本站,發(fā)現(xiàn)更好的自己
投遞簡歷
馬上投遞
提示
該職位僅支持官方網(wǎng)站投遞
關閉 去投遞
會員中心 提示:訂單支付,立即生效
天數(shù): 0
共計: 0
支付方式:
微信支付
支付寶支付
確認 取消